WBI Wizard
Workplace safety, handled digitally.
Safety instructions for work on the railway, from PDF to a digital record. Review, activate and sign in on site.
Visit wbiwizard.nlWBI
Work site 2026-118Checked
Km 12.4 to 13.1
Track 1 and 2
01:00 to 05:00
Out of service
ActivateAt a glance
- For
- Rail and infrastructure
- Status
- Live
- Platform
- Web app, also outdoors
- Website
- wbiwizard.nl
01 / 03
From PDF to record.
The instruction is read and filled in. You only need to check it.
WBI
Work siteKm 12.4 to 13.1
TracksTrack 1 and 2
Time01:00 to 05:00
MeasureOut of service
02 / 03
Sign in on site.
On your phone, even in the rain and with gloves on.
OutdoorWork site 118Km 12.4 to 13.1 · 01:00Sign in
03 / 03
A register that always adds up.
Who, where and when, traceable to the minute.
Register
00:52Signed in
00:54Signed in
00:58Signed in
01:00Active
04:47Signed out
05:00Released